



It includes construction of the South Bellevue Station including a new 1,500 stall parking garage, now open for use. South Bellevue Segment: I-90 East Channel Bridge to Southeast Fourth Street on 112th Avenue Southeast.The tunnel was completed in September 2020.

Tunnel: Approximately one-half mile of tunnel from Main Street to Northeast Sixth Street.Sound Transit is evaluating controls, safety and signal systems along East Link throughout 2023. The six East Link stations as well as the downtown tunnel in Bellevue, constructed in separate segments, are substantially completed.
